Choosing Your Flooring
Engineered wood flooring is solid for DIYers with some skill, but let’s be real – it’s probably smarter to save yourself the stress and ask an expert. Plus, if you go with a pro, they’ve got guarantees to back up our product warranty. Win-win!
- i. Browse your options: Take a scroll through our selection and pick your favourites – there’s something to suit every home aesthetic.
- ii. Did someone say, FREE samples? Yep! You can bag up to 3 samples (there’ll be on their way the next working day). Keep in mind, they’re only to give you an idea of colour in the beginning stages and might not give you the full “wow” factor that the final product will.
- iii. Visit one of our trusted retailers: Go big or go home – check out larger samples to get the full effect. Ask about stock availability and if they do installations too. You can find your closest one using our store locator on here.
- iv. Book a site survey: Let’s make sure your subfloor is ready. A pro can check the level and dampness as well as give you a full quote (materials included). We’re looking for flat, level & dry – so there’s no surprises.
- v. Order your new flooring: Once you’re happy with your quote, go ahead and get your floor – but don’t forget to account for a little wastage (10-20% is a good buffer). Retailers might offer a “supply and install” deal, or a “supply-only” one – but that won’t come with a warranty.
- vi. Your pre-installation checklist:Site survey done and dusted.Dry, warm, weather-tight site conditions.Everything has been delivered to you or your fitter.The flooring has had its 48-hour rest and acclimatised (laid flat, sealed in its box).Cleaning products? Check.
- vii. The installation:
- There are two main ways to do it:Stick: You glue it to the subfloor – simple and strong.Float: Flooring just clicks together using D3-rated PVA glue and rests on underlay. No gluing to the subfloor needed.
Note: If you’re doing herringbone or chevron patterns, they must be stuck to a level subfloor. Floating is only an option for straight plank.
- viii. Post-installation: Let your floor chill for 24 hours before you start showing it off. Pro tip: If you’re having other work done, install the flooring later in your project to avoid damage from other trades. If needed, cover it with breathable material (but not for too long). And if you’ve got underfloor heating, make sure it’s turned off while the floor’s settling in.
- ix. Enjoy: Ta-da! Your floor is ready to be enjoyed for years to come.